A cruel
close up of the overhead crane. Construction is as follows. The
crane gantry is constructed of plastruct "I" girders.
The girder that runs into the shed is actually 2 girders glued
side by side. Runiing inside that is a length of square section
tube that the crane cable runs in. This allows the cran to move
loads in and out of the building. |
 |